Data sheet
MaintWiz Shutdown Module Data Sheet
This data sheet lists what the MaintWiz shutdown module does, where each capability lives, and what it integrates with. The module is an add-on to the MaintWiz platform and covers scheduling, readiness gates, spares with SAP status, work orders, ePTW permits and an executive view.
Data sheet issued October 2026.
By Jai Balachandran · Published · Last reviewed
Covers:CapabilitiesSpecificationIntegrationsRoles
Capabilities
What are the capabilities of the MaintWiz shutdown module?
The MaintWiz shutdown module covers portfolio planning, scheduling with critical path and float, readiness gates, cost control, spares with SAP status, work orders with checklists, permits and isolations from ePTW, close-out and an executive view, as the table lists with each capability’s location, integrations and limits. 1
A worked example of the module's measures: shutdown case study planned vs actual. Download this data sheet as a PDF.
The module is an add-on to the MaintWiz platform and reuses its work orders, spares, approvals, ePTW, preventive maintenance scheduling, instruments and calibration, and SAP integration.
| Capability | What the module does | Where it lives | Integrations |
|---|---|---|---|
| Portfolio board and timeline | Shows current projects by phase or on a timeline; upcoming projects in a second tab; blackout windows from the admin calendar | Portfolio | Admin calendar |
| Availability of trades and tools | Total, used and available counts for each common tool and trade, and weekly availability | Portfolio, Availability | Resource master, Excel template |
| Schedule | Gantt chart and table of the plan, with dates, durations and float that agree on every screen | Plan, Schedule | Excel, Primavera P6, Microsoft Project |
| Critical path and float | Lists critical activities and their float; flags an activity at or below an admin float limit | Plan, Schedule | None |
| Baselines | Shows what moved against the plan | Plan, Baselines | None |
| Readiness gates | Checks each work package against six gates and shows a go result; waivers and sign-offs need a typed reason and are saved with the name and the date | Controls, Readiness | Spares, ePTW, resource plan |
| Cost control | Planned value, earned value, actual cost, cost and schedule indices; budget, actual and forecast | Controls, Earned value and Cost | None |
| Risk register | Risks with a score and an owner | Controls, Risk | None |
| Spares and SAP status | Needed, in stock, short and SAP cover; each short part shows none, request raised or order issued | Supply chain, Procurement | SAP through the PM or the MM module |
| Work orders | Five states, task list by activity type, tick, reading and photo tasks, limits on readings, hours, parts used, findings to the planner, handover note, attachments up to 5 MB | Execute, Work orders | Shared MaintWiz work order module; QR scan |
| Permits and isolations | Show on each work order and in the readiness gate; an open permit or isolation blocks closing the package | Execute and Controls | ePTW |
| Work packages | Completion from closed tasks, derived status, closure with a reason, reopening | Execute, Work packages | None |
| Close-out | Handover, lessons learnt, reports, deferred items, archive of closed projects | Close-out | None |
| Executive view | Health matrix, decisions with Approve and Decline, effect in days and money, one timeline of all projects | Exec View | None |
| Administration | Calendars, shifts, rate cards, tool hire rates, units, planning rules and menu access by role | Admin | None |
| Monte Carlo finish confidence | Shows the confidence of the finish date by running the schedule many times with uncertain durations | Control | None |
| Critical chain analysis | Analyses the schedule with resource constraints and buffers | Plan | None |
| What-if scenarios | Tests the effect of changed durations, crews or materials on the finish before you decide | Plan | None |
| What moves the forecast finish | Shows each cause of a change in the forecast finish, with forecast methods, formulas and inputs, and a drill-down to the packages | Plan | None |
| Daily actual cost | Stores the actual cost of each day for a true cost history | Control | None |
| Ranked risks | Ranks risks by the days at stake | Executive | None |
| AI agents with an approval step | AI agents propose changes from live project numbers; a person approves each one | AI agents | None |
| Named-submenu access | Limits access to named submenus by role | Admin | None |
Specification
What are the main specifications?
The module organizes work as portfolio, project, work package, work order and task, and uses five work order states and seven gate checks, as the specification table lists.
| Item | Value |
|---|---|
| Hierarchy | Portfolio, project, work package, work order, task |
| Concurrent projects | Many projects in one portfolio |
| Work order states | Initiated, work in progress, waiting, completed, reopen |
| Task kinds | Tick, reading with unit and limits, photo |
| Attachments | Up to 5 MB each, with a thumbnail for images |
| Readiness gates | Six checks (materials, resources, predecessors, tools and scaffold, permits and isolations, scope and engineering) and a go result |
| SAP status of a part | None, purchase request raised, purchase order issued |
| Menus | My Day, Exec View, Portfolio, Project, Plan, Supply chain, Controls, Execute, Close-out and Admin |
| Exports | The table behind each supply chain chart exports to Excel; schedules export to Microsoft Project XML, with interoperability with Primavera P6 |
| Offline | Transaction screens |
Integrations
What does the module integrate with?
The module integrates with SAP through the PM or the MM module, with Excel, Microsoft Project XML and Primavera P6 interoperability, with IoT sources and with ePTW.
See shutdown software vs spreadsheets vs Primavera P6 for how these systems divide the work. For PM and MM modes see SAP PM shutdown management and SAP MM shutdown materials.
| System | What it does | Direction |
|---|---|---|
| SAP (PM or MM module) | Keeps SAP as the system of record and shows request and order status against each part | Reads status; objects depend on the mode chosen |
| Excel | Loads resources and work from templates; exports tables | Import and export |
| Microsoft Project XML and Primavera P6 | Exchanges schedules with the planners’ tools through Microsoft Project XML, with interoperability with Primavera P6 | Import and export |
| IoT | Brings in sensor data | Inbound |
| ePTW | Supplies permits and isolations | Inbound |
Roles
Which roles use the module and what do they see?
A central planner sees every menu, a project manager sees every menu except Portfolio until an administrator allows it, and a foreman sees only My Day and the work orders of Execute by default.
A fuller RACI matrix is in shutdown team roles and RACI.
| Role | Default access |
|---|---|
| Central planner | Every menu, including Portfolio |
| Project manager | Every menu except Portfolio, until an administrator ticks it; sees all projects of the facilities the user may access |
| Foreman | My Day and the Work orders submenu of Execute |
| Administrator | Sets access in a grid of roles and menus; changes apply at once |
Custom roles can be created to match each client's requirements.
FAQ
Frequently asked questions
What is this data sheet for?
It lists what the MaintWiz shutdown module does, where each capability lives, and what it connects to, so a buyer or an IT team can check them. For an overview see the shutdown module page.
More questions are answered in the shutdown module FAQ.
How is the module deployed and licensed?
This sheet does not cover deployment or licensing. Ask for a demo and the sales team will provide them.
Which systems does it connect to?
SAP through the PM or MM module, Excel, Microsoft Project XML, interoperability with Primavera P6, IoT sources and ePTW.
Where are the questions about shutdown practice answered?
In the guides, starting with the pillar page and the 40-step checklist.
Where are the common questions?
See the shutdown module FAQ.
Sources
Sources
The description comes from the MaintWiz product requirements and the current build. The one external source defines the scheduling terms.
- US Government Accountability Office, GAO Schedule Assessment Guide: Best Practices for Project Schedules (GAO-16-89G, December 2015)
- US Department of Health and Human Services, Earned Value Management, Appendix D: Glossary of Terms
- OSHA, 29 CFR 1910.147, The control of hazardous energy (lockout/tagout)
- UK Health and Safety Executive, The safe isolation of plant and equipment (HSG253, 2006)
Check the sheet against your shutdown
Book a demo and bring your shutdown scope. We will walk through how MaintWiz can support it.